R&D 1.0 was a temporary layout to test the design and to find out if a crew for OPS could be assembled. It was built using three modules (two were later used in a Myth Buster’s episode), several hollow core doors, and many pieces of plywood, all held together with “rawhide and ductape” and drywall screws.
Here are a few photos.




