Southern Pacific Coast Division Monterey Branch
Mission: The primary goal is entertainment. Secondary goal is to replicate the SP Coast Division in 1941. This will be achieved incrementally with scenery, locos, rolling stock and method of operating moving toward the secondary goal; as long as they don’t derail the primary goal.
THE LAYOUT
bench work start 8-2014
Benchwork: open grid
~22 locos
~290 cars
min rad 30”
main line ~150’
branch line ~235’ (includes helix)
room 23’ X 35’
ceiling 9’6”
track: code 83
turnouts 171:: Fast Tracks ~95, Peco76
deck height lower 35” – 40”
deck height upper 60”
work aisles ~45”
max grade 2.7% (in the loop)
helix grade 2.0%
turnouts #8 mainline, #6 otherwise
OPS
1st OPS 6-2015
TRACK WARRANTS TTTO
crew optimal 9, minimum 7, max 11 crew 12 to 13
crew positions:1 dispatcher, 3 yard men, 5 trainmen 1 dispatcher, 3 operators, 2 -3 yard men, 7 trainmen
session length 2 to 8+ hours – –
~5 trains/hour 4 to 5 trains/hour
emphasis on switching; yards and towns —
reset time 0 minutes reset 1 hour
4 position cc/wb —
NCE radio DCC —
track warrants via radio from dispatcher orders by telephone
Castroville
Granite Rock
Salinas lettuce sheds
Salinas
